How reduce time of manufacture from the phase of design

 
Cómo reducir tiempos de fabricación desde la fase de diseño
In industrial manufacture to measure, the terms do not begin when it goes in the material in the workshop. They begin a lot before: in the design.
A lot of companies try to reduce time presionando the production. However, the main opportunity of optimisation is in the previous phase, when it still is possible simplify processes, delete unnecessary operations and facilitate the mechanised or the welding.
Design thinking in manufacture no only reduces costs: it shortens terms of direct form.

Simplify geometries without affecting the function
Each change of section, deep cavity or complex detail can involve more operations of mechanised, more tie up in machine or special tools.
A functional design but simplified allows:
> Fewer changes of tool
> Less reposicionamientos
> Processes faster and stable
The productive efficiency many times depends more than the simplicity that of the sophistication.

Adjust tolerances to the real need
Apply strict tolerances in all the piece augments time of mechanised and verification. Define with precision which heights are critical allows to concentrate resources where really imports and accelerate the rest of the process.
Strategic precision, no generalised.

Design pieces thought for an alone tie up
When a piece can mechanise in the minor possible number of tie up, the total time of manufacture reduces significantly. Each change of position involves preparation, verification and risk of deviations.
Think the design in function of how will attach in machine is a decision that impacts directly in the term.

Standardise components when it was possible
In machinery and structures to measure, no all has to be entirely personalised. Incorporate elements normalised (tornillería standard, usual accommodations, commercial thicknesses) reduces time of procurement and mechanised.
The personalización intelligent combines own design with standard solutions.

Coordinate design and workshop from the home
The early communication among engineering and manufacture allows to detect improvements before launching production. You adjust minima in phase flatly can avert back delays.
In industrial projects, revise the design with productive approach is an investment, no a cost.

Reduce terms without engaging quality
Shorten time does not mean to work faster in the workshop. It means to work better from the design.
 

In Màxim Machines collaborate with engineerings and technical departments to analyse plans with industrial vision. Our aim is to maintain the functionality of the project optimising processes of mechanised, welding and assembling.
Because in manufacture to measure, the shortest term is not the one who accelerates in production, but the one who schedules correctly from the beginning.
If you are developing a new project and want to validate how optimise it before manufacturing, can help you to revise it with practical approach.
 